Develop a solution for the following line balancing problem,allowing a cycle time of 5 minutes.
a.Draw the precedence diagram for the set of tasks.
b.Calculate the theoretical minimum number of workstations.
c.Balance this line using the longest task time heuristic.
d.What tasks are assigned to which stations?
e.Does the solution have the minimum number of stations? Explain.
f.How much idle time is there,summed over all workstations?
g.What is the efficiency of this line?
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q132: An assembly line consists of 21 tasks
Q137: An assembly line has been designed to
Q141: A facility is trying to set up
Q143: An assembly line with 11 tasks is
Q144: A firm is planning to set up
Q145: An assembly line is assigned as follows.Station
Q145: Hemo-tech,Inc. ,a biomedical technology and research laboratory,produces
Q308: _ is the maximum time that the
Q315: Identify the formulas for the following terms
Q317: A(n) _ line is a machine-paced product-oriented
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents