A work study has been conducted on a new operation with three work elements.The following times,in minutes,were obtained using the continuous method. a.What is the normal time for this operation?
b.If an allowance of 20 percent is used,what is the standard time for this task?
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q4: How can work standards be developed for
Q63: The sample size needed for a time
Q68: The key to creating a work standard
Q71: Perform a time study on yourself as
Q73: What are the limitations of time studies?
Q74: The most commonly used method for setting
Q95: A pilot work study has been conducted
Q101: An undergraduate business student studies diligently in
Q102: The Dean's office is interested in determining
Q106: What are the strengths and limitations of
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents