Table 6.2
High Tech,Inc.is producing two types of products: A and B.Both are produced at the same sawing operation.Because of demand uncertainties,the operations manager obtained three demand forecasts (pessimistic,expected,and optimistic) .The demand forecasts,batch sizes (units/batch) ,processing times (hr/unit) ,and setup times (hr/batch) follow. The sawing machines operate on two 8-hour shifts,5 days per week,and 50 weeks per year.The manager wants to maintain a 10 percent capacity cushion.
-Using the information from Table 6.2,what is the maximum number of machines needed (assuming no reliance on short-term option) ?
A) fewer than or equal to 25
B) more than 25 but fewer than or equal to 28
C) more than 28 but fewer than or equal to 31
D) more than 31
Correct Answer:
Verified
Q54: An expansionist capacity strategy:
A) lags behind demand.
B)
Q58: Table 6.1
The Union Manufacturing Company is producing
Q60: If a system is well balanced,which one
Q61: Table 6.5
The T.H.King Company has introduced a
Q62: Table 6.2
High Tech,Inc.is producing two types of
Q64: Table 6.3
The North Bend Manufacturing Company is
Q65: Table 6.4
Mr.Lee is considering a capacity expansion
Q66: Table 6.3
The North Bend Manufacturing Company is
Q67: Table 6.4
Mr.Lee is considering a capacity expansion
Q68: Table 6.6
Burdell Labs is a diagnostic laboratory
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents