Work standards would NOT be helpful for management in which area?
A) developing costs for current and new products
B) determining current and projected capacity requirements for a given demand
C) comparing different routings for an item and evaluating new work methods and equipment
D) forecasting demand for current products
Correct Answer:
Verified
Q2: Fatigue, rest, or unavoidable delays are not
Q7: The work measurement process creates labor standards
Q10: The performance rating factor in a time
Q13: Time studies are appropriate for setting time
Q14: The snap-back method of time study resets
Q16: A time study is the method most
Q19: The key to creating a work standard
Q21: Garman observes a worker assembling peanut valves
Q25: When using a time study approach, the
Q34: With a time study approach, the:
A) nature
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents