Garman observes a worker assembling peanut valves and records the data displayed in the table.What is the select time for this job element?
A) 15 seconds
B) 20 seconds
C) 25 seconds
D) 30 seconds
Correct Answer:
Verified
Q13: Time studies are appropriate for setting time
Q14: The snap-back method of time study resets
Q16: A time study is the method most
Q18: Work standards would NOT be helpful for
Q19: The key to creating a work standard
Q24: Garman observes a worker assembling peanut valves
Q25: When using a time study approach, the
Q25: The gentleman farmer recorded the time it
Q26: An industrial engineer is conducting a time
Q34: With a time study approach, the: