Garman observes a worker assembling peanut valves and records the data displayed in the table.During one of the cycles,the worker knocked the shaft out of the fixture and had to realign the fixtures.What is the select time for this job element?
A) less than 23 seconds
B) greater than or equal to 23 seconds but less than 26 seconds
C) greater than or equal to 26 seconds but less than 29 seconds
D) greater than or equal to 29 seconds
Correct Answer:
Verified
Q13: Time studies are appropriate for setting time
Q16: A time study is the method most
Q21: Garman observes a worker assembling peanut valves
Q25: When using a time study approach, the
Q25: The gentleman farmer recorded the time it
Q26: An industrial engineer is conducting a time
Q28: To set a time standard for a
Q34: With a time study approach, the:
A) nature
Q37: Table H.1
A worker was observed for four
Q38: An analyst using a time study approach:
A)
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents