Which of the following is not true about process design?
Question 42
True/False
The process flow diagram for services is called a service blueprint.
Question 43
True/False
Heuristic approaches to line balancing guarantee an optimal solution.
Question 44
True/False
Process design determines the structure of a process-that is,the sequence of operations (the workflow),resources,and controls needed for a particular process
Question 45
True/False
Process design determines the structure of a process-that is,the sequence of operations (the workflow),resources,and controls needed for a particular process.
Question 46
True/False
The theoretical minimum number of workstations for a production line is a function of the sum of task times and the cycle time.
Question 47
True/False
Cycle time is the maximum time allowed at each workstation to complete its assigned tasks on each unit of production before it moves on.
Question 48
True/False
The overall efficiency of a production line is equal to the percentage idle time times the number of workstations.
Question 49
Multiple Choice
Which of the following is not a factor considered in make-or-buy decisions?
Question 50
True/False
An advantage of a U-shaped production line is that it facilitates teamwork and flexibility in work assignments.
Question 51
True/False
"Balance delay" is another name for the percentage of idle time in a product layout.
Question 52
True/False
A core process is a process that assists the operations of an organization.
Question 53
True/False
Automation is the application of scientific discoveries to the development and innovation of goods and services and/or the processes that produce them.
Question 54
Multiple Choice
In which type of operations process are you likely to see products or services produced in low to moderate volumes,with some degree of standardization,and moderate flexibility of the processing equipment used?