"Time compression diseconomies" means:
A) Being unable to achieve sufficient volume in a short time-scale.
B) The extra costs incurred by a second or subsequent mover attempting to quickly catch up the critical mass of a first-mover's key resources.
C) The costs of employing extra staff and paying overtime which make a project uneconomic.
D) Not achieving an economic production level due to lost time e.g. because of a strike.
Correct Answer:
Verified
Q19: When are resources and competencies valuable for
Q20: From a capability standpoint, 2001 was a
Q21: Sources of strategic resource immobility between firms
Q22: The ability of a firm achieving a
Q23: The key to success is:
A)Having a clear
Q25: What is the link between capabilities and
Q26: Resource and capability appraisal is:
A)A fixed process
Q27: Establishing an inventory of a firm's resources
Q28: Despite the theories and tools for analysing
Q29: The existence of a competitive advantage through
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents