An electronics manufacturer makes remote control devices for interactive-cable-TV systems. The following assembly tasks must be performed on each device.
(a) Draw the precedence diagram for this problem.
(b) What is the sum of the task times?
(c) What cycle time will allow the production of 200 units over a ten-hour day?
(d) What is the theoretical number of workstations needed?
(e) Balance this assembly line using the heuristic most following tasks and the heuristic longest operation time.
(f) How do these two solutions differ? Which do you prefer; why?
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q300: A production line is to be designed
Q301: Explain what the purpose of assembly-line balancing
Q302: A company is designing a product layout
Q303: Cyclone Appliances has developed a new European-style
Q304: An assembly line has been designed to
Q306: A facility is trying to set up
Q307: Assembly line balancing has just been used
Q308: _ is the maximum time that the
Q309: You have been asked to balance a
Q310: Identify the five common layout heuristics used
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents