A facility is trying to set up an assembly line, and has identified the various tasks, and their relationship to each other, as shown in the following table. Managers wish to produce 600 units per day, working two 8-hour shifts.
(a) Draw a network diagram of precedence relationships.
(b) Compute the required cycle time per unit in seconds.
(c) Compute the minimum number of workstations required to produce 600 units per day.
(d) Balance this line using the longest processing time heuristic.
(e) What is the efficiency of the line obtained in part (d)?
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q301: Explain what the purpose of assembly-line balancing
Q302: A company is designing a product layout
Q303: Cyclone Appliances has developed a new European-style
Q304: An assembly line has been designed to
Q305: An electronics manufacturer makes remote control devices
Q307: Assembly line balancing has just been used
Q308: _ is the maximum time that the
Q309: You have been asked to balance a
Q310: Identify the five common layout heuristics used
Q311: A company is trying to balance production
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents