An assembly line is assigned as follows. Station 1- task A and B. Station 2- task C and D. Station 3- task E and F. The task times are 2, 8, 2, 9, 5, and 4 minutes respective to A, B, C, D, E, and F. (Assume that there is no precedence relationship between the tasks, i.e., they can be performed in any order.)
(a) Calculate the efficiency.
(b) What would the assignment of tasks to stations be using the shortest processing time heuristic (assuming the current maximum station time remains the cycle time)?
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q311: A company is trying to balance production
Q312: An assembly line with 11 tasks is
Q313: A firm operates a flow shop building
Q314: Develop a solution for the following line
Q315: Identify the formulas for the following terms
Q316: Hemo-tech, Inc., a biomedical technology and research
Q317: A(n) _ line is a machine-paced product-oriented
Q318: A firm is planning to set up
Q319: What are the advantages and disadvantages of
Q320: An assembly line consists of 158 tasks
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents