The is the amount that was budgeted to achieve the work that was scheduled to be performed up to that point in time.
A) total budgeted cost (TBC)
B) cumulative budgeted cost (CBC)
C) cumulative actual cost (CAC)
D) cumulative earned value (CEV)
Correct Answer:
Verified
Q41: A method for calculating the forecasted cost
Q42: Earned value, the value of _, is
Q51: A third method for determining the forecasted
Q54: Calculate the cost variance if the cumulative
Q58: If the cumulative earned value is R10
Q59: Plot _ curves on the same graph
Q72: The contractor's outflow of cash can be
Q73: The contractor might try to negotiate payment
Q78: When evaluating work packages that have a
Q80: It's crucial that cost variances and inefficiencies