The average number of transcribed lines per month at Bent Tree Hospital is 142,500. The daily production standard is 950 lines per day. With 20 workdays in the month, calculate the minim number of FTEs needed for this volume.
A) 13
B) 8
C) 6
D) 7.5
Correct Answer:
Verified