Which three tasks must be completed in preparation of a site for an ACP 4200 installation? (Choose three.)
A) Determine the list of Customer Administrators who will require login access to the ACP 4200.
B) Install power connections for the ACP 4200.
C) Plan the path from the delivery location to the permanent site.
D) Determine a permanent location for the ACP 4200.
E) Enable SNMP management on the network devices that will be connected to the ACP 4200.
Correct Answer:
Verified
Q2: What is the purpose of the VMware
Q3: Refer to the exhibit. Q4: How would an administrator display the IP Q5: When an administrator logs into Avaya Orchestrator Q6: An ACP 4200 engineering team is considering Q7: An installation engineer is installing the power Q8: Refer to the exhibit. Q9: A new instance/customer and new VMs are Q10: Which statement about the factory default configuration Q11: Refer to the exhibit. Unlock this Answer For Free Now! View this answer and more for free by performing one of the following actions Scan the QR code to install the App and get 2 free unlocks Unlock quizzes for free by uploading documents![]()
![]()
![]()