The following technique requires the use of "dummy" activities:
A) the Gantt chart.
B) the AON network method.
C) the AOA network method.
D) the critical chain method.
E) all logic diagramming methods.
Correct Answer:
Verified
Q5: In a network, the critical path indicates:
A)
Q6: The early expected start time, ES, of
Q7: The latest allowable finish time that an
Q8: Doing a project fast has the following
Q9: The advantages of scheduling include all of
Q11: If Activity A has to be performed
Q12: The critical path:
A) is shortest path through
Q13: In a start-to-start relationship, a 2-day lag
Q14: The criticism of network techniques that some
Q15: Resource leveling:
A) makes use of float (slack)