Using the three-point estimate technique, what is the estimated time to complete a project based on the following scenario?
Debbie is preparing a statement of qualifications for a client who needs to hire an engineering firm to design a new outfall structure. Debbie needs an overall estimate of the time it may take to complete the project, even though many critical design issues are unknown. Debbie asks three engineers for their best guess. Steve thinks it will take only 1 year. Jenny estimates 3 years. Kyle, who has designed similar structures, thinks a realistic estimate is 2.5 years.
A) 1.8 year
B) 2.3 years
C) 2.4 years
D) 2.8 years
Correct Answer:
Verified
Q2: What critical path project management tool is
Q3: Which of the following best describes the
Q4: Which of the following project management tools
Q5: Which of the following project management tools
Q6: Using the three-point estimate technique, what is
Q7: Which of the following best describes the
Q8: Which of the following terms is used
Q9: Which of the following project management tools
Q10: Which of the following is a basic
Q12: Which of the following best describes the
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents