Solved

Using the Three-Point Estimate Technique, What Is the Estimated Time

Question 11

Multiple Choice

Using the three-point estimate technique, what is the estimated time to complete a project based on the following scenario?
Debbie is preparing a statement of qualifications for a client who needs to hire an engineering firm to design a new outfall structure. Debbie needs an overall estimate of the time it may take to complete the project, even though many critical design issues are unknown. Debbie asks three engineers for their best guess. Steve thinks it will take only 1 year. Jenny estimates 3 years. Kyle, who has designed similar structures, thinks a realistic estimate is 2.5 years.


A) 1.8 year
B) 2.3 years
C) 2.4 years
D) 2.8 years

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents