A work center had actual input of 280 hours and actual output of 270 hours. What is the change in backlog?
A) 10
B) -10
C) 0
D) 1.037
E) unable to determine with given information
Correct Answer:
Verified
Q27: If job 5 takes 3,4 or 5
Q34: The assignment method is:
A) a method to
Q42: If an assignment problem consists of 5
Q45: EDD stands for
A) earliest due date
B) earliest
Q46: Which of the following is an aid
Q47: A work center had planned outputs of
Q49: There are two jobs to be assigned
Q50: Which of the following dispatching rules ordinarily
Q51: A scheduling technique used to achieve optimum,
Q52: Five jobs are waiting to be