Question 61
Multiple Choice
The process capability index (Cpk) may mislead if: (I) the process is not stable. (II) the process output is not normally distributed. (III) the process is not centered.
Question 62
Multiple Choice
A control chart used to monitor the number of defects per unit is the:
Question 63
Multiple Choice
Which of the following relationships must always be incorrect?
Question 64
Multiple Choice
A shift in the process mean for a measured characteristic would most likely be detected by a:
Question 65
Multiple Choice
Which of the following is not a step in the control process?
Question 66
Multiple Choice
The purpose of control charts is to:
Question 67
Multiple Choice
A plot below the lower control limit on the range chart: (I) should be ignored since lower variation is desirable. (II) may be an indication that process variation has decreased. (III) should be investigated for assignable cause.