Which of the following is not required for a lean system?
A) Flexible workforce
B) A Type II MRP system
C) A stable master schedule
D) Kanban pull system
Correct Answer:
Verified
Q10: A kanban card is used to signal
Q14: Why is production leveled in a lean
Q16: If it takes 100 minutes to complete
Q18: If a work center has no empty
Q19: The ideal lot size for a lean
Q20: With regards to suppliers,lean systems typically require:
A)Delivery
Q21: What are the eight forms of waste?
Q22: When kanban is used,only the final assembly
Q24: With lean thinking,a company's operations layout should
Q32: Kaizen events typically take between 1 to