If it takes 100 minutes to complete a circuit,demand at the next work center is 5 parts per minute,and a container will hold 20 parts,how many containers are required?
A) 25
B) 5
C) 40
D) 20
Correct Answer:
Verified
Q2: External setup time refers to:
A)The time it
Q10: A kanban card is used to signal
Q13: Given the following information pertaining to item
Q14: Why is production leveled in a lean
Q18: If a work center has no empty
Q19: The ideal lot size for a lean
Q19: Which of the following is not required
Q20: With regards to suppliers,lean systems typically require:
A)Delivery
Q21: What are the eight forms of waste?
Q28: Value stream maps are similar to flowcharts
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents