If a work center has no empty containers,the workers at the work center will do which of the following?
A) Continue to produce as much inventory as they can
B) Produce enough inventory to meet the following day's demand
C) Produce enough inventory to satisfy the master production schedule
D) Stop production
Correct Answer:
Verified
Q10: A kanban card is used to signal
Q13: Given the following information pertaining to item
Q14: Why is production leveled in a lean
Q16: If it takes 100 minutes to complete
Q19: The ideal lot size for a lean
Q19: Which of the following is not required
Q20: With regards to suppliers,lean systems typically require:
A)Delivery
Q21: What are the eight forms of waste?
Q22: When kanban is used,only the final assembly
Q32: Kaizen events typically take between 1 to
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents