If the schedule calls for the production of 120 units per day and 480 minutes of production time are available per day,the cycle time would be 4 minutes.
Correct Answer:
Verified
Q102: The assumptions necessary for a successful product-oriented
Q103: In assembly-line balancing,the theoretical minimum number of
Q106: A production line is to be designed
Q107: A production line is to be designed
Q264: One drawback of a product-oriented layout is
Q267: What are the advantages of focused factories?
Q280: Product-oriented layouts tend to have high levels
Q281: Which one of the following is NOT
Q288: Cycle time is computed as:
A) desired output
Q300: A production line is to be designed
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents