Table 12-1
The following represents a project with know activity times. All times are in weeks.
-According to Table 12-1, compute the slack time for activity D.
A) 0
B) 5
C) 3
D) 6
E) None of the above
Correct Answer:
Verified
Q14: PERT stands for Probabilistic Evaluation and Review
Q17: Given the assumptions in PERT, the probability
Q36: In a PERT network,the earliest (activity)start time
Q38: Slack is the time an activity can
Q39: CPM stands for Comprehensive Project Method.
Q41: Given an activity's optimistic,most likely,and pessimistic time
Q42: Table 12-1
The following represents a project with
Q45: Table 12-2
The following represents a project with
Q46: Table 12-2
The following represents a project with
Q50: Given an activity's optimistic,most likely,and pessimistic time
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents