Capacity planning is the creation of a series of interrelated hierarchical plans.The levels of these plans correlate with the levels of the manufacturing framework.Which of the following capacity plan and manufacturing process matches are at the same level?
1) Sales and Operations Planning <-->Rough-Cut Capacity Planning
2) Shop-Floor Control (SFC) <-->Rough-Cut Capacity Planning
3) Material Requirements Planning (MRP) <-->Capacity Requirements Planning
4) Master Production Scheduling (MPS) <-->Input/Output Analysis
A) (1)
B) (2) and (4)
C) (3)
D) (1) , (2) , and (4)
Correct Answer:
Verified
Q15: Product gamma requires a sequence of 5
Q16: Using RCOF and the information in
Q17: Using RCOF and the information in
Q18: The movie theater has scheduled 6 showings
Q19: Among the alternative RCCP approaches, name the
Q21: Product gamma requires a sequence of
Q22: What is the planning horizon of the
Q23: Describe the activities and scope of Long-Range
Q24: The effective capacity of the Jack Furniture
Q25: Write the equation for Rated capacity.
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents