Using RCOF and the information in the table below, find the labor hour requirement for Work center 1.The following is the distribution of the load across the WCs:
WC1 (25%) , WC2 (55%) , WC3 (20%) .
A) 42.35 hours
B) 38.85 hours
C) 15.4 hours
D) 19.25 hours
Correct Answer:
Verified