There are 3 work stations (WC) with the following capacity: WC1 (2,000 units) , WC2 (2,500 units) , and WC3 (1,500 units) .While the load could be shifted from WC1 to WC2 and also in the opposite direction, WC3's load cannot be shifted to other WCs as a result of specialized equipment.In the following load situation, what is not a good solution?
WC1: 1500 units, WC2: 2250 units, WC3: 3100 units
A) Subcontracting
B) Increasing the efficiency of the operation
C) Pushing work back
D) Rerouting work to another work center
Correct Answer:
Verified
Q1: Choose, among the following options, the inputs
Q2: Capacity is the measure of productive capability
Q3: Material Requirements Planning (MRP)operates on a component
Q4: Of the following capacity planning horizons, which
Q5: _ is a major function of the
Q7: Choose the statements that differentiate the Resource
Q8: Choose, among the following examples of capacity,
Q9: Of the following solutions for overloaded work
Q10: Which of the following is a correct
Q11: Dave is conducting Rough-Cut Capacity Planning (RCCP)for
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents