When using the beta probability distribution to estimate activity times,which of the following statements is TRUE?
A) The project manager is usually the only person involved in making time estimates, since obtaining estimates from workers involved in the activities would result in inconsistent estimates.
B) The beta distribution is used as a way of approximating a normal probability distribution for time estimates.
C) The use of most optimistic, most likely, and most pessimistic times for an activity will result in a determination of the expected times for that activity.
D) The larger the difference between most pessimistic time and most optimistic time for an activity, the smaller the variance of that time estimate.
Correct Answer:
Verified
Q21: Which one of the following best describes
Q35: Activity slack is defined as:
A) latest start
Q55: For controlling projects, the Schedule Performance Index
Q60: Which of the following is NOT one
Q62: Table 3.2
Time (days)
Q65: Table 3.2
Time (days)
Q67: Table 3.2
Time (days)
Unlock this Answer For Free Now!