Question 1
Multiple Choice
The static budget variance for materials is £200 F and the budgeted cost for materials is £52,000. If the budgeted volume is 13,000 and the actual volume is 13,500, then the flexible budget variance is
Question 2
Multiple Choice
Figure 16-1 Armati, SA., is looking for feedback on company performance. The company compares the budget for the year with the actual costs. Data have been collected below: Armati, SA., had the following budgeted data:
The following actually occurred:
-Refer to Figure 16-1. The flexible budget variance for indirect labour for 2011 is
Question 3
Multiple Choice
Figure 16-1 Armati, SA., is looking for feedback on company performance. The company compares the budget for the year with the actual costs. Data have been collected below: Armati, SA., had the following budgeted data:
The following actually occurred:
-Refer to Figure 16-1. The static budget variance for supplies is
Question 4
Multiple Choice
Figure 16-1 Armati, SA., is looking for feedback on company performance. The company compares the budget for the year with the actual costs. Data have been collected below: Armati, SA., had the following budgeted data:
The following actually occurred:
-Refer to Figure 16-1. The static budget variance for direct materials is
Question 5
Multiple Choice
Which of the following is not an objective of responsibility accounting?
Question 6
Multiple Choice
Figure 16-1 Armati, SA., is looking for feedback on company performance. The company compares the budget for the year with the actual costs. Data have been collected below: Armati, SA., had the following budgeted data:
The following actually occurred:
-Refer to Figure 16-1. The flexible budget for direct materials cost in 2011 is
Question 7
Multiple Choice
If the static budget variance for materials is £200 F and the budgeted cost for materials is £52,000, then the actual cost of materials is
Question 8
Multiple Choice
Figure 16-1 Armati, SA., is looking for feedback on company performance. The company compares the budget for the year with the actual costs. Data have been collected below: Armati, SA., had the following budgeted data:
The following actually occurred:
-Refer to Figure 16-1. The flexible budget for rent in 2011 is
Question 9
Multiple Choice
The budget most appropriate for control purposes is the
Question 10
Multiple Choice
Figure 16-1 Armati, SA., is looking for feedback on company performance. The company compares the budget for the year with the actual costs. Data have been collected below: Armati, SA., had the following budgeted data:
The following actually occurred:
-Refer to Figure 16-1. The flexible budget variance for total cost for 2011 is
Question 11
Multiple Choice
When budgets are used for control,
Question 12
Multiple Choice
If production was budgeted at 400 units and the actual production was 420 units, what would be the static budget variance for materials if the actual cost of materials was £4,150 and the budgeted cost per unit is £10?