Lean Six Sigma differs from Six Sigma in the following way
A) the PDCA cycle is not used in order to make the process "leaner"
B) it is used only for lean manufacturing operations
C) verifiable data are not needed in order to make decisions
D) reducing waste has been added to the Six Sigma concept
Correct Answer:
Verified
Q7: TQM requires that management operate on Theory
Q8: (Place the letter of Total Quality Management
Q9: Which of the following methods is the
Q10: In the TQM philosophy of management, reducing
Q11: (Place the letter of the work improvement
Q12: The best definition of productivity is:
A) level
Q13: One of the first steps in a
Q14: One of the overall objectives of work
Q16: A fish diagram is a measurement tool.
Q17: In a hospital foodservice which of the
Unlock this Answer For Free Now!