Operations and Supply Chain Management Study Set 7
Quiz 22: Workcenter Scheduling
Path 4
Access For Free
Share
All types
Filters
Study Flashcards
Practice Exam
Learn
Question 1
True/False
A system that "backward schedules" is designed to determine and report the earliest date an order can be completed.
Question 2
True/False
Priority rules are the rules used to obtain a job sequence in production scheduling.
Question 3
True/False
In production scheduling, the process of determining which job to start first on some machine or in some workcenter is known as sequencing or priority sequencing.
Question 4
True/False
Under the STR/OP sequencing priority rule, orders with the jobs with the longest STR/OP are run first.
Question 5
True/False
A shop-floor control system is a system that uses data from the shop floor as well as data processing files to maintain and communicate status information on shop orders and workcenters.
Question 6
True/False
The LCFS and Johnson's priority rules are basically the same except LCFS uses due dates as a major determiner of job sequence.
Question 7
True/False
Using the random order or "whim" priority rule to sequence production jobs means that supervisors or operators select whichever job they feel like running.
Question 8
True/False
Theoretically, all schedules are feasible when finite loading is used.
Question 9
True/False
In infinite loading, no consideration is given directly to whether there is sufficient capacity at the resources required to complete the work, nor is the actual sequence of the work as done by each resource in the workcenter considered.