A simple CPM network has three activities, D, E, and F. D is an immediate predecessor of E and of F. E is an immediate predecessor of F. The activity durations are D=4, E=3, F=6.
A) The critical path is D-E-F, duration 12.
B) The critical path is D-F, duration 10.
C) Slack at D is 0 periods.
D) Slack at E is 3 periods.
E) Both A and C are true.
Correct Answer:
Verified
Q48: Identify, in order, the six steps basic
Q49: The difference between AON and AOA networks
Q50: The _ is the computed longest time
Q51: Which of the following statements regarding CPM
Q52: Activity R on a CPM network has
Q54: The critical path can be determined by
Q55: The _ is a project management technique
Q56: The main difference between PERT and CPM
Q57: Every network has at most one critical
Q58: What is the basic difference between PERT
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents