The information necessary to conduct a bottom-up estimate of project time and cost starts with the ___________.
A) level 4 elements of the WBS
B) milestones
C) work package
D) planning horizon
E) level 5 elements of the PBS
Correct Answer:
Verified
Q66: Estimates should be made based on _
Q67: Costs that are associated with time devoted
Q68: Mega projects are large-scale, complex ventures that
Q69: The salary of the project manager and
Q70: A way to improve estimates on future
Q72: The preferred method for situations where the
Q73: The approach to estimating project time and
Q74: Consider a five-mile-long railroad tunnel. Tunnel experts
Q75: A project estimator is working on estimates
Q76: The top-down method of estimating project time