Consider a five-mile-long railroad tunnel. Tunnel experts and advocates estimate the total cost to be $200 million. What is the reference class for this project? But reference class projects in this area have been over-budget by 30%. So, what should the actual revised budget number be for this proposed five-mile tunnel project?
A) Past bridge projects, $230 million
B) Past tunnel projects, $260 million
C) Past highway projects, $200 million
D) Past building projects, $230 million
E) Past construction projects, $230 million
Correct Answer:
Verified
Q69: The salary of the project manager and
Q70: A way to improve estimates on future
Q71: The information necessary to conduct a bottom-up
Q72: The preferred method for situations where the
Q73: The approach to estimating project time and
Q75: A project estimator is working on estimates
Q76: The top-down method of estimating project time
Q77: The estimating approach that is best to
Q78: The bottom-up method of estimating where work
Q79: Project costs such as labor and materials
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents