The total length of the trench required in a leaching field is determined by
A) effluent quality and the ability of the soil to absorb water from the drain pipes.
B) code requirements.
C) the amount of effluent predicted to be conveyed into the leaching field in a 24-hour period.
D) the results of the percolation test.
Correct Answer:
Verified
Q2: Anaerobic processes
A) occur when oxygen is deficient.
B)
Q3: For residential applications, septic tank size is
Q4: The outlet of a septic tank should
Q5: The six steps in public water treatment
Q6: At least 50' should be between any
Q7: Sewer pipe should be uniformly supported on
Q8: Cleanouts are required by most codes at
A)
Q9: The minimum septic tank size should be
Q10: Private sewage disposal systems are used for
A)
Q11: What is the first consideration when sizing
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents