Estimators typically turn to preliminary estimating methods to compile a budget estimate when there is too little design information available to put together a detailed estimate.
Correct Answer:
Verified
Q3: Single-rate methods are generally accurate and can
Q4: The typical bay method is more flexible
Q5: _ estimation methods include price per typical
Q6: The _ of the building is calculated
Q7: Preliminary estimating methods can be used to
Q9: Using the price per unit estimating method
Q10: With the _ method of estimating, a
Q11: Assembly estimating can be a powerful cost
Q12: Using the _ method, a building, which
Q13: Which of the following is NOT a