Using the ____ method, a building, which may contain hundreds of components, may be reduced to a few assemblies, which can be measured and priced relatively quickly from records of previous assembly costs.
A) elemental
B) component
C) piece
D) assembly
Correct Answer:
Verified
Q7: Preliminary estimating methods can be used to
Q8: Estimators typically turn to preliminary estimating methods
Q9: Using the price per unit estimating method
Q10: With the _ method of estimating, a
Q11: Assembly estimating can be a powerful cost
Q13: Which of the following is NOT a
Q14: The _ is defined as the area
Q15: _ estimating methods include the price per
Q16: The _ estimating method can be used
Q17: Single-rate methods of preliminary estimating include all