Using the price per unit estimating method can generate a rough estimate quickly, but the lack of accuracy will render it of little use in cost planning.
Correct Answer:
Verified
Q4: The typical bay method is more flexible
Q5: _ estimation methods include price per typical
Q6: The _ of the building is calculated
Q7: Preliminary estimating methods can be used to
Q8: Estimators typically turn to preliminary estimating methods
Q10: With the _ method of estimating, a
Q11: Assembly estimating can be a powerful cost
Q12: Using the _ method, a building, which
Q13: Which of the following is NOT a
Q14: The _ is defined as the area