Services
Discover
Homeschooling
Ask a Question
Log in
Sign up
Filters
Done
Question type:
Essay
Multiple Choice
Short Answer
True False
Matching
Topic
Trade & Technology
Study Set
Refrigeration and Air Conditioning Technology
Quiz 38: Installation
Path 4
Access For Free
Share
All types
Filters
Study Flashcards
Practice Exam
Learn
Question 21
Short Answer
Before a system is evacuated, all piping should be filled with nitrogen and a small amount of refrigerant, in order to be ___________________ checked.
Question 22
Short Answer
The typical gauge wire that is used in low voltage control circuits is ____________________ gauge.
Question 23
Essay
Even though the cooling wire runs from the thermostat to the air handler, it actually just continues on to the condensing unit. Why isn't the cooling wire run directly from the thermostat to the condensing unit?
Question 24
Essay
What materials are normally used in air-conditioning duct systems?
Question 25
Essay
Explain service accessibility.
Question 26
Essay
Why is it necessary that the crankcase heater heats the compressor crankcase before starting the compressor?
Question 27
Short Answer
How much does sunshine affect the operation of a condensing unit?
Question 28
Short Answer
A split central air-conditioning system is installed with the control transformer located in the attic-hung air handler and the condensing unit located outside. The low voltage wire from the thermostat is run to the ____________________.