You are preparing to test newly installed open office cabling. Within the open office cabling, there are multiple consolidation points (CP) that were installed while waiting for furniture. How do you proceed with permanent link testing?
A) Test to each CP, then test from CP to workstation.
B) Wait for open office cabling to be completed, then test to each workstation outlet, including the CP.
C) Test that the CP is within 90 meters, then test again to the workstation outlet.
D) Perform permanent link tests to each CP, then continuity tests from CP to each workstation outlet.
E) Test to each workstation outlet, treating each outlet as a channel.
Correct Answer:
Verified
Q181: Exhibit: The diagram below is a typical
Q182: You have been asked to test and
Q183: When balanced twisted-pair copper cabling, return loss
Q184: Select the appropriate task to complete section
Q185: Select the appropriate task to complete the
Q187: What is the worst case acceptance value
Q188: What is the PERT estimate of time
Q189: Which of the following does NOT describe
Q190: What type of estimate is based on
Q191: Which is NOT true about conformance quality?
A)
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents