Exhibit: If a work breakdown structure (WBS) shows the tasks below, what is C, the successor task? A) Install OSP pathways B) Install fiber C) ________. 
A) Hold inspection
B) Create budget
C) Conduct safety meeting
D) Perform site survey
Correct Answer:
Verified