Question 1
Multiple Choice
When setting up scheduled backups to a network location, which two steps are required? (Choose two.)
Question 2
Multiple Choice
You are configuring the Real-Time Statistics Multicast (RSM) settings on a newly installed Avaya Aura Contact Center (AACC) . Which address is within the acceptable range for use as an IP Multicast address on Contact Center Manager Server (CCMS) ?
Question 3
Multiple Choice
Which three Mission Critical High Availability (HA) solutions does Contact Center Release 7 support? (Choose three.)
Question 4
Multiple Choice
You are installing a SIP-based Avaya Aura Contact Center (AACC) with Avaya Aura Media Server (AAMS) . Which three functions/features are gained by implementing the AAMS? (Choose three.)
Question 5
Multiple Choice
After a successful installation of Avaya Aura Contact Center, Avaya releases a patch for this particular site that is required to fix a problem reported for the CCMS. Currently, the service pack AvayaCC_CCMS_7.0.0.0.11.0021_Patch is installed under CCMS and no roll-up patches have been installed yet. What is a valid name for the site specific patch?
Question 6
Multiple Choice
After the Avaya Aura Media Server High Availability (HA) pair is formed, several Element Manager pages display new features that reflect the new paired High Availability state/status. In the primary AAMS Element Manager navigation pane, which three features do you need to status? (Choose three.)
Question 7
Multiple Choice
For Avaya Aura Contact Center (AACC) High Availability (HA) , you must backup the active server database, restore it onto the standby server and enable shadowing. Database shadowing does not work if the difference in time between the active and the standby server database is greater than how many hours?
Question 8
Multiple Choice
A customer has installed Avaya Aura Contact Center (AACC) on a Platform Vendor Independent (PVI) server. They want to receive real-time data on their client computer via Unicast stream. Where do you set the transmission mode for the site to Unicast?
Question 9
Multiple Choice
You are deploying Avaya Agent Desktop (AAD) for the first time in a SIP-enabled contact center. Which configuration step should be performed in Contact Center Management Administration (CCMA) for agents to use AAD?
Question 10
Multiple Choice
In a Mission Critical AACC High Availability (HA) campus solution, there are two types of switchovers, managed and unmanaged. A managed switchover is one initiated by the administrator or caused by a failure of a monitored Contact Center Manager Server (CCMS) or Communication Control Toolkit (CCT) component. An unmanaged switchover results from a hardware, network, database or power failure. Which three conditions must be satisfied before a switch over can occur? (Choose three.)
Question 11
Multiple Choice
When performing a database restore, Avaya Aura Contact Center (AACC) services must be shut-down before starting the restore. How are these services shut-down?
Question 12
Multiple Choice
After you complete the Avaya Aura Contact Center (AACC) installation, you should perform a backup. From the Contact Center Database Maintenance utility, which two menu options are used to perform the backup?