In a Mission Critical AACC High Availability (HA) campus solution, there are two types of switchovers, managed and unmanaged. A managed switchover is one initiated by the administrator or caused by a failure of a monitored Contact Center Manager Server (CCMS) or Communication Control Toolkit (CCT) component. An unmanaged switchover results from a hardware, network, database or power failure. Which three conditions must be satisfied before a switch over can occur? (Choose three.)
A) Switchover is only enabled on the standby server.
B) The active server database and standby server database are synchronized, and the standby server database is shadowing the active server database.
C) The active and standby servers can communicate with the trusted server
D) The active and standby servers have switchover enabled.
E) The active server is running. All the critical CCMS and CCT services are running.
Correct Answer:
Verified
Q5: After a successful installation of Avaya Aura
Q6: After the Avaya Aura Media Server High
Q7: For Avaya Aura Contact Center (AACC) High
Q8: A customer has installed Avaya Aura Contact
Q9: You are deploying Avaya Agent Desktop (AAD)
Q11: When performing a database restore, Avaya Aura
Q12: After you complete the Avaya Aura Contact
Q13: On which servers is the Enable Switchover
Q14: During the Avaya Aura Contact Center (AACC)
Q15: You have created a new application (script)
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents