Solved

In a Mission Critical AACC High Availability (HA) Campus Solution

Question 10

Multiple Choice

In a Mission Critical AACC High Availability (HA) campus solution, there are two types of switchovers, managed and unmanaged. A managed switchover is one initiated by the administrator or caused by a failure of a monitored Contact Center Manager Server (CCMS) or Communication Control Toolkit (CCT) component. An unmanaged switchover results from a hardware, network, database or power failure. Which three conditions must be satisfied before a switch over can occur? (Choose three.)


A) Switchover is only enabled on the standby server.
B) The active server database and standby server database are synchronized, and the standby server database is shadowing the active server database.
C) The active and standby servers can communicate with the trusted server
D) The active and standby servers have switchover enabled.
E) The active server is running. All the critical CCMS and CCT services are running.

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents