Mobilization advance
A) Shall be 2 to 5 % of project cost.
B) Shall be 3 to 7 % of project cost.
C) Shall be 10 to 15 % of project cost.
D) Shall be 12 to 18 % of project cost.
Correct Answer:
Verified
Q4: Which are the criteria to be checked
Q5: How many envelops are required to submitted
Q6: Total no of grades for registration of
Q7: Contract is terminated in case of
A)Slow progress
Q8: Form no .........is used for material at
Q10: PERT analysis is based upon
A)Optimistic time
B)Pessimistic time
C)Most
Q11: The time activity consumes in most adverse
Q12: The time activity consumes in normal conditions
Q13: The difference between the total float and
Q14: The critical path is
A)The longest path of