Question 61
Multiple Choice
A Decision Tree is a is a visual decision making tool that can prove useful across a number of business settings. Decision trees provide all of the following EXCEPT:
Question 62
Multiple Choice
The following is a multiple regression model. What do the regression coefficients b1 and b2 represent? Y
i
= b
0
+ b
1
X
1i
+ b
2
X
2i
+e
i
Question 63
Multiple Choice
A process is a:
Question 64
Multiple Choice
The ability of an electronic scale to measure substances consistently every time the measurement is made is referred to as _____________.
Question 65
Multiple Choice
_____ is a tool that is used in the define phase of Six Sigma DMAIC, and can be used in developing high level process maps in a process improvement project.
Question 66
Multiple Choice
Real estate agents at a national agency meet on a weekly basis to discuss property pricing. With repossessed homes, the proper procedure for pricing is for three real estate agents to agree on a selling price. This is an example of ____________.
Question 67
Multiple Choice
Workers in the overnight shift at an assembly line, on average, require 8.5 minutes to complete once production cycle. Production managers have contributed this to biological differences in overnight reaction times. What type of variation is this an example of:
Question 68
Multiple Choice
The following are examples of statistical process control charts EXCEPT:
Question 69
Multiple Choice
Project specification limits are set by managers in response to customers' expectations. The largest specification value that can be obtained and still be acceptable to customer expectations is referred to as:
Question 70
Multiple Choice
The Cp index is a measure of potential process performance as seen in the equation below. What does a Cp value greater than 1 imply? Cp = USL - LSL/ 6( Rbar/d2) = specification spread/process spread
Question 71
Multiple Choice
The Six Sigma approach allows for a shift of as much as ______ standard deviations, so it is essentially a ±4.5 standard deviation goal.
Question 72
Multiple Choice
Ron's research team is examining the tread quality of their company's new tires. The team decides to use a factorial design that is examining 2 types of tread in 3 different types of metal installations. What type of design is this?
Question 73
Multiple Choice
A C
p
of more than 2 implies that a process has the potential of _____________ expectations of Six Sigma standards.
Question 74
Multiple Choice
A hotel manager wishes to compare packaged deals to frequent guests. Specifically, he is interested in whether those who receive business deals stay longer than those who receive personal deals. What statistical test is most appropriate to compare the two deals?
Question 75
Multiple Choice
Statistical Process Control (SPC) is an application of statistical methodology such as experiments to ensure that a process produces desired effects. SPC can be broken down into understanding the following factors EXCEPT:
Question 76
Multiple Choice
In Total Quality Management, most variation in a process is due to the system not the individual. Is this statement true?
Question 77
Multiple Choice
In an effort to mobilize resources needed for the annual fundraising campaign, Stewart uses a specialized type of bar chart to track the project's milestones within important phases. What is this type of bar chart referred to?