The changes in a net-change MRP system ______.
A) cause the entire production plan to regenerate
B) affect only those components whose information has been changed or updated
C) explode the bill of materials
D) cause shutdown of the production process
Correct Answer:
Verified
Q26: Which of the following is an output
Q27: What is the process that identifies which
Q28: The changes in firm planned orders _.
A)happen
Q29: In part-period balancing lot-sizing technique,_.
A)the order interval
Q30: Which file contains data about materials,components,parts,and the
Q32: Which of the following is an input
Q33: Which of the following reports can be
Q34: The lot-sizing technique which almost eliminates inventory-holding
Q35: Net requirements is calculated as _.
A)Gross requirements
Q36: In lot-for-lot lot sizing,_.
A)inventory holding costs are
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents