Which of the following is NOT one of the types of probabilistic estimates used in PERT?
A) optimistic
B) historical
C) most likely
D) pessimistic
Correct Answer:
Verified
Q4: We may need to consider noncritical activities
Q5: If the standard deviation is 2.78 and
Q6: Which of the following statements is true
Q7: The Z value corresponding to a probability
Q8: The formula for the expected duration of
Q10: If the cost slope for an activity
Q11: Let us say that x is an
Q12: If the most optimistic and pessimistic times
Q13: In the formula for the expected duration
Q14: The variance for a project's duration is