The formula for the variance of the duration of an activity is ______.
A) the square root of [1/6(b - a) ]
B) [1/6(a - b) ] raised to the power of 2
C) [1/6(b - a) ] raised to the power of 2
D) the square root of [1/6(a - b) ]
Correct Answer:
Verified
Q11: Let us say that x is an
Q12: If the most optimistic and pessimistic times
Q13: In the formula for the expected duration
Q14: The variance for a project's duration is
Q15: A Z value of 0.72 corresponds to
Q17: Whether we should crash an activity or
Q18: According to the operations profile at the
Q19: An Activity X has a duration of
Q20: A project's standard deviation is _.
A)the square
Q21: Establishing the project's baseline requires _.
A)the work
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents