To calculate the theoretical minimum number of workstations (N) required,______.
A) we need to first calculate the cycle time
B) we need to first calculate the difference between task times
C) we need to first calculate the balance efficiency
D) we need to first calculate the flow time
Correct Answer:
Verified
Q81: A gozinto chart is another name for
Q82: In a production process,the total time consumed
Q83: If the sum of all task times
Q84: If the sum of all task times
Q85: If the sum of all task times
Q87: The desired cycle time in a production
Q88: In a production process,the total time consumed
Q89: As real-life layout problems are typically large,we
Q90: As real-life layout problems are typically large,arriving
Q91: In process layouts,the process facilities are shared