The cost to prepare bottom-up estimates will typically run how much more than the costs to prepare the top-down estimates?
A) About the same
B) About twice as much
C) About three times as much
D) About four times as much
E) About five times as much
Correct Answer:
Verified
Q30: The bottom-up approach for estimating times and
Q30: Which of the following would be considered
Q31: The estimating factor known as _ considers
Q32: Resource shortages, in the form of people,
Q33: Which of the follow top-down methods is
Q36: People working on prototype development needing time
Q37: Design flaws being revealed after the fact,
Q38: Project costs are typically viewed from all
Q39: Reasons why estimating time and cost are
Q40: Estimates that are typically based on estimates