Reasons why estimating time and cost are important include all of the following except:
A) To schedule work
B) To determine how long the project should take and cost
C) To develop cash flow needs
D) To determine how well the project is progressing
E) All of the above are valid reasons
Correct Answer:
Verified
Q30: The bottom-up approach for estimating times and
Q35: The cost to prepare bottom-up estimates will
Q36: People working on prototype development needing time
Q37: Design flaws being revealed after the fact,
Q38: Project costs are typically viewed from all
Q40: Estimates that are typically based on estimates
Q41: Using the _ method of forecasting project
Q42: In the _ method of estimating project
Q43: Costs that are not directly related to
Q44: The prevailing belief in some firms that
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents